In the heart of Touraine, the Paris-Bordeaux High Speed Line (LGV) saw the foundation of its track deteriorate following the completion of a crossing under the track for a fire network, which caused a decompression problem soils with an alteration of the foundation of the soil as well as the appearance of fontis on the surface. In order to resolve these disorders, the SNCF Réseau pole has opted for the soil consolidation solution offered by URETEK®.
Selection of products
To see also
Popular News
- A report on anticipating the effects of +4°C warming reaffirms the need for housing adaptation
- Bruno Le Maire unveils his simplification bill to free SMEs, VSEs and artisans from administrative paperwork
- What steps for an efficient energy transformation of the building?
- Guillaume Kasbarian asks public land establishments to release in 2024 the land necessary for the production of 17.000 housing units
Publi-editorial
- EduRénov Plan: Rockwool unveils its Guide to successful energy renovation of school buildings
- Hydro'Way, Eco'Urba, StabiWay and Baltazar... permeable floor covering solutions from JDM Expert
- Glass pergola: enjoy its outdoor spaces with elegance and modernity all year round
- Cleaning exterior wood: dedicated Owatrol solutions