"Preparatory work" was launched on Friday in Paris on the site which will host the very controversial Triangle tower, even if the construction site as such should not start until "in January", indicated the group Unibail-Rodamco-Westfield (URW ) to AFP.
Selection of products
To read also
- Rebuilding Notre-Dame de Paris receives PEFC certification
- Equilis, between city and nature, an architecture redesigned by Anthony Bechu, architect and Aliénor Bechu-Blond, interior architect and designer
- In Paris, the tram extends to the west, before perhaps completing the loop
- Olympic Games-2024: at the France stadium the athletics track is dressed in purple
- Under the glass roof of the Grand Palais, Macron launches the home stretch before the Olympics
- Notre-Dame: 5 years after the fire, the main reconstruction challenges addressed
- Lorillard Building, synonymous with excellence for the 4 IGH towers in Lambersart
- Deadlines will be met for the reconstruction of Notre-Dame de Paris
Popular News
- The Elevator Federation unveils its roadmap and figures for the 2023 sector
- Bruno Le Maire unveils his simplification bill to free SMEs, VSEs and artisans from administrative paperwork
- Guillaume Kasbarian asks public land establishments to release in 2024 the land necessary for the production of 17.000 housing units
- The government presents its controversial housing law