Since the end of 2023, the Airbus site in Toulouse has been supplied with renewable heat thanks to two biomass installations. The first dates from 2013, and the commissioning of the second at the end of 2023.
Selection of products
To see also
Popular News
- Old property prices are still falling but a recovery is taking shape
- A report on anticipating the effects of +4°C warming reaffirms the need for housing adaptation
- Bruno Le Maire unveils his simplification bill to free SMEs, VSEs and artisans from administrative paperwork
- Guillaume Kasbarian asks public land establishments to release in 2024 the land necessary for the production of 17.000 housing units
Publi-editorial
- Cero IV minimalist sliding door by Solarlux: light as the protagonist
- Create, modify and reuse with Block Walls
- Hydro'Way, Eco'Urba, StabiWay and Baltazar... permeable floor covering solutions from JDM Expert
- EduRénov Plan: Rockwool unveils its Guide to successful energy renovation of school buildings