Contact the manufacturerYou have a project ?
Get a quotation




More images CheckHide
Description See +Hide
The Tubo'INFILTRATION®:
The Tubo'INFILTRATION® is an innovative system for rainwater management, allowing efficient and sustainable infiltration into the soil to replenish groundwater.
With its galvanized steel structure, Tubo'INFILTRATION® guarantees exceptional durability and quick, cost-effective installation. Tubo'INFILTRATION® perfectly meets the requirements of waterway permitting for construction projects and other infrastructure. It can be installed under traffic lanes without a concrete slab and adapts seamlessly to the urban environment while complying with environmental standards.
Fully accessible and inspectable, its maintenance is simplified. The structure's lifespan is between 50 and 100 years (with additional coating and T renchCoat® ).
Characteristics CheckHide
- Double-sided hot-dip galvanized steel 725g / m²
- Pipes assembled with clamps from 300 to 3000 mm in diameter
- Several thicknesses depending on the rolling overloads and diameter
- Made in France in Neuville sur Saône (69250)
General documentation CheckHide
Video CheckHide
- #Infiltration
- #Pool
- # Spillway
- #Water
- #Rain
- #Floods









