In order to meet the societal and environmental challenges of Center Parcs for its new Landes de Gascogne area, the consortium made up of ENGIE Solutions, SEM Avergies and the forestry cooperative Alliance Forêts Bois has designed, built and will operate a biomass boiler that will deliver heat 90% carbon free.
Selection of products
To read also
- Deadlines will be met for the reconstruction of Notre-Dame de Paris
- The start-up Lockall invests 18 million euros to buy and transform the 22.000 m2 of a building in the City of Paris
- Launch of work on the second Brest tram line
- On the route of the A69, three “squirrels” perched and a construction site which continues to advance
- The construction site of an Ardèche religious complex suspended by the prefecture
- Rheinzink participates in the renovation of the Saint-Jean institution in Colmar
- In Grenoble, the Perret Tower is getting a new lease of life
- Segro Center Paris Les Gobelins: first urban logistics hotel that generates links
Popular News
Publi-editorial
- Cero IV minimalist sliding door by Solarlux: light as the protagonist
- Hydro'Way, Eco'Urba, StabiWay and Baltazar... permeable floor covering solutions from JDM Expert
- A new low-carbon C2S1 glue enters the “Responsible & Sustainable” range offered by PRB
- EduRénov Plan: Rockwool unveils its Guide to successful energy renovation of school buildings