In order to meet the societal and environmental challenges of Center Parcs for its new Landes de Gascogne area, the consortium made up of ENGIE Solutions, SEM Avergies and the forestry cooperative Alliance Forêts Bois has designed, built and will operate a biomass boiler that will deliver heat 90% carbon free.
Selection of products
To read also
- Olympic Games-2024: at the France stadium the athletics track is dressed in purple
- Under the glass roof of the Grand Palais, Macron launches the home stretch before the Olympics
- Notre-Dame: 5 years after the fire, the main reconstruction challenges addressed
- Lorillard Building, synonymous with excellence for the 4 IGH towers in Lambersart
- Deadlines will be met for the reconstruction of Notre-Dame de Paris
- The start-up Lockall invests 18 million euros to buy and transform the 22.000 m2 of a building in the City of Paris
- Launch of work on the second Brest tram line
- On the route of the A69, three “squirrels” perched and a construction site which continues to advance
Popular News
Publi-editorial
- A new low-carbon C2S1 glue enters the “Responsible & Sustainable” range offered by PRB
- Cero IV minimalist sliding door by Solarlux: light as the protagonist
- EduRénov Plan: Rockwool unveils its Guide to successful energy renovation of school buildings
- Cleaning exterior wood: dedicated Owatrol solutions