The Nuclear Safety Authority (ASN) indicated on Thursday February 29 that it had received ten project leaders for mini-nuclear reactors (PRM) at various stages of maturity, one of which is already in the starting blocks to submit by the end March a first request for authorization.
Selection of products
To read also
- Calogena requests approval for its nuclear boiler
- EDF wants to reduce the construction time of a nuclear power plant to less than six years
- “Two reactors per year”: EDF’s very ambitious bet to revive nuclear power
- Nuclear waste: the “battle” of expropriations begins in Bure
- Return to favor of nuclear power in the European Union
- Nuclear: the forecast cost of the six future EPRs will increase by 30%
- Eleven countries, including France, call on the EU to no longer discriminate against nuclear power
- Nuclear safety reform: the IRSN inter-union fears “a drop in the level of protection”
Popular News
- Building insulation manufacturer ordered to pay 858.242 euros for false advertising and deception
- The increase in "notary fees" in real estate will not affect first-time buyers according to Matignon
- Building materials still in turmoil
- Real estate diagnosticians contest a new study which concludes on upgrades and anomalies in DPEs
Publi-editorial
- Interior wood, velvet effect or second skin: exceptional protections from Oléofloor
- ViaCon France innovates and revolutionizes water storage with flange connections
- Obat in the running for the Batinfo Innovation Trophies: the AI Assistant that is revolutionizing the creation of quotes in the construction industry
- FAKRO flat roof windows: excellent lighting and impeccable aesthetics