The electrical connection work has started for the future offshore wind farm off Calvados, scheduled to come into service in 2024, announced Monday RTE, responsible for carrying them out.
Selection of products
To read also
- Deadlines will be met for the reconstruction of Notre-Dame de Paris
- The start-up Lockall invests 18 million euros to buy and transform the 22.000 m2 of a building in the City of Paris
- Launch of work on the second Brest tram line
- On the route of the A69, three “squirrels” perched and a construction site which continues to advance
- The construction site of an Ardèche religious complex suspended by the prefecture
- Rheinzink participates in the renovation of the Saint-Jean institution in Colmar
- In Grenoble, the Perret Tower is getting a new lease of life
- Segro Center Paris Les Gobelins: first urban logistics hotel that generates links
Popular News
Publi-editorial
- Cleaning exterior wood: dedicated Owatrol solutions
- A new low-carbon C2S1 glue enters the “Responsible & Sustainable” range offered by PRB
- Cero IV minimalist sliding door by Solarlux: light as the protagonist
- Hydro'Way, Eco'Urba, StabiWay and Baltazar... permeable floor covering solutions from JDM Expert