NGE will build the new spillway for the Orédon dam (Hautes-Pyrénées) on behalf of SHEM, an ENGIE subsidiary. This project, which began in early April 2026 and is scheduled to last three years, will increase the maximum capacity of the current spillway from 50 m³/s to 213 m³/s in order to cope with a 10,000-year flood event.
Selection of products
To read also
-
Hardelot: The exceptional Odunes residence enters a new phase with the official laying of the foundation stone
-
Notre-Dame de Fourvière Basilica: a 67-meter scaffolding to restore the four towers
-
Protest against the Seine-Nord Europe Canal, a demonstration banned by the prefecture
-
Le Havre tramway: Spie batignolles paysage is carrying out one of the biggest projects in its history
-
NGE is mobilizing its expertise to replace the footbridge crossing the Allier river in Cournon-d'Auvergne
-
The Council of State gives the green light to the continuation of the controversial A69 construction project.
-
RenouVaulx, a 100% low-carbon concrete real estate complex in Vaulx-en-Vélin (69)
-
Seine-Nord Europe Canal: Before the bulldozers, an extraordinary archaeological challenge
Popular News
-
Housing stimulus: the Senate adopts the bill to accelerate construction and renovation
-
Heatwave: a comprehensive energy renovation can reduce by three the number of days of overheating in the home
-
Homes with good energy performance ratings but stifling temperatures during heatwaves: the shortcomings of summer comfort
-
Real estate market: a difficult first half, an even more worrying second half
Publi-editorial
-
Optimize your project management with the SANCOL reinforced drainage range, which has received Technical Approval and QB certification.
-
70 years of Rustol-Owatrol: Protecting, beautifying, recycling, maintaining, and extending the life of metal structures, both indoors and outdoors.
-
OXI thermal range: neither hot nor cold, find the right solution
-
Jouplast® unveils its online configurator: a revolution for designing your terrace with ease




