In June, NGE reached a major milestone in the project to replace the footbridge crossing the Allier River in Cournon-d'Auvergne with the dismantling of the old structure. This complex project, carried out in a particularly sensitive environment, illustrates the Group's expertise in civil engineering, special foundations, river works, and exceptional lifting operations.
Selection of products
To read also
-
In Bordeaux, Terres de Bastide is launching its first phase of 328 student accommodations
-
Montpellier University Hospital chooses the Acosi+ heating and cooling ceiling to ensure thermal comfort in its new geriatrics unit
-
Hardelot: The exceptional Odunes residence enters a new phase with the official laying of the foundation stone
-
Notre-Dame de Fourvière Basilica: a 67-meter scaffolding to restore the four towers
-
Protest against the Seine-Nord Europe Canal, a demonstration banned by the prefecture
-
Le Havre tramway: Spie batignolles paysage is carrying out one of the biggest projects in its history
-
The Council of State gives the green light to the continuation of the controversial A69 construction project.
-
RenouVaulx, a 100% low-carbon concrete real estate complex in Vaulx-en-Vélin (69)
Popular News
-
Business failures: nearly 17.500 cases in the second quarter of 2026, up 5,4%
-
Solar panels: Creuse, Ain and Vosges show the strongest increases in installations in France
-
Montparnasse Tower: Asbestos removal project put to a vote despite conflicts between co-owners
-
Fires in Gironde: UNICEM calls for a case-by-case resumption of activities in the materials sector
Publi-editorial
-
Home renovation: understanding how the Effy energy bonus works
-
70 years of Rustol-Owatrol: Protecting, beautifying, recycling, maintaining, and extending the life of metal structures, both indoors and outdoors.
-
Obligation and safety: the role of the manufacturer's plate on construction sites
-
PRB Mass: a complete range of sealants for all your needs




