Simone Veil school group - Argenteuil (95)
The Simone Veil School Group is a new construction inaugurated on the occasion of the start of the new school year in September 2019. Myral siding, installed in ventilated cladding on a wooden structure, is particularly suitable for "construction on wooden frames" (COB). The cladding, easy to handle and incorporating a fastening system adapted to this method of construction, made it possible to quickly and easily install some 2 m000 of facade panels.
Complete realization sheet: click here
Residence - Avenue Pierre Curie, Charny (89)
For the aesthetic and thermal rehabilitation of the facades of this lot of two buildings each comprising 20 HLM dwellings, the prime contractor turned to our solution of ITE M32. The colors "Creamy white" and "Ruby red" provide the façades with a contrasting covering, giving a real facelift to this decades-old housing complex.
Complete realization sheet: click here
IUT of Lannion, Lannion (22)
50 years after its construction, the renovation of the building had two objectives: to modernize the whole by giving it an aesthetic in accordance with contemporary standards, but also and above all, to ensure optimal insulation of the building. The specifications included many problems: covering an asbestos facade, finding a solution to improve airtightness and intervening on occupied sites.
Complete realization sheet: click here
EHPAD "Les Agapanthes", Bron (69)
Named "Les Agapanthes", this establishment, which emerged from the ground in February 2019, with a capacity of 122 beds, benefits from a modern and warm architecture. The ITE Myral solution, in addition to offering a contemporary aesthetic and optimal insulation performance, is also adapted to the regulations in force in terms of seismic and fire safety.
Complete realization sheet: click here
Anatole France College, Limoges (87)
Launched by the Departmental Council of Haute-Vienne, this major refurbishment operation of the Anatole France college in Limoges aimed to improve the thermal insulation of this building, built in the 70s.
Complete realization sheet: click here