In the Haute-Savoie department, a crack appeared on a prestressed concrete bridge. The structure, although still in service, raised questions about the extent of the crack in the medium term.
Selection of products
To read also
-
In Antony, nearly 1.000 homes are switching to a heating system combining geothermal and aerothermal energy.
-
In Balma, the comprehensive renovation of 373 social housing units combines external insulation using rock wool and a B energy efficiency label.
-
In Paris, Bergère x Paris is renovating 26.500 m² of office space while preserving 632 existing window frames
-
Electricity storage: a 240 MW installation inaugurated in Cernay-lès-Reims
-
A26 is designing three 20-bed units at the Pierre-Lôo Hospital Center
-
Malakoff: Charlotte-Delbo middle school welcomes 600 students after an investment of 38,2 million euros
-
In Oregon, Aurora River House combines reused materials with metal and wood facades on the banks of the Willamette River.
-
In Massy, the Centre Pompidou Francilien unveils its 30.000 m² before its opening in 2027
Popular News
-
Real estate: prices are falling again, rising interest rates weaken the recovery
-
2027 Budget: MPs vote for a 5,5% VAT rate on electricity, without an immediate reduction in bills
-
Mortgage loans: rising interest rates are eroding the amount of living space households can afford
-
Energy renovation: a group warns of a 2027 budget that risks penalizing low-income households.
In order to assess the behavior of this crack, the manager entrusted SID with a long-term monitoring mission.






