On Tuesday, October 1, the administrative court annulled the authorization to build and operate three wind turbines in Porspoder (Finistère), in particular due to the proximity of several menhirs classified as historic monuments.
Selection of products
To read also
-
Collapses on Rue d'Aubagne in Marseille: prison sentences for co-owners, suspended sentences for the elected official and the expert
-
Telephone canvassing: more than 400.000 euros in fines for a heating and air conditioning equipment company in Alsace
-
Lead poisoning at the Palace of Versailles: up to two years of suspended prison sentence for five men
-
Prison sentence for former butcher turned slum landlord
Popular News
-
Crisis or Correction? Seaside Resorts Face Falling New Property Prices
-
CAPEB submits an action plan to the Minister of Housing with 30 concrete measures for a sustainable revival of the construction industry
-
In the middle of a heatwave, the question of air conditioning fuels political tensions
-
The modification of the DPE in favor of electric heating should allow 850.000 homes to be freed from the status of energy sieves