Arrived by exceptional convoy, the third section of the future Île-Parc Girodet footbridge, the most imposing (about fifty tonnes), was installed on the night of Wednesday 26 to Thursday 27 April during a spectacular operation at above the A7 motorway, closed for the occasion.
Selection of products
To read also
-
Large manholes for large-scale works in Rosnay L’Hôpital
-
In Nantes, the largest hospital under construction in Europe uses low-carbon concrete
-
On the French-Italian border, tunnel delays reinforce isolation
-
The reconstruction of Notre-Dame is progressing as planned, the arrow visible during the Olympics
-
Philippe Jost, General Georgelin's right-hand man, succeeds him to oversee the reconstruction of Notre-Dame
-
The Rehau active slab equips the future headquarters of the French Federation of Canoeing and Paddle Sports (FFCK)
-
The Canal Seine-Nord Europe project receives the HQE Sustainable Infrastructures certification issued by Certivea for its “Program” phase
-
A 950-ton monument moved to Toulouse for the 3rd metro line
Popular News
-
The construction industry enters into recession and anticipates the loss of 150.000 jobs by 2025
-
Despite repeated warnings from developers, the government is letting the new housing market collapse
-
White paint, a shield against heatwaves?
-
Roof renovation proves its efficiency in the energy performance of individual houses