EDF thinks it has found solutions for its EPR reactor at Flamanville to the three problems that forced a Chinese EPR into a long shutdown, but the examination of these proposals by the French nuclear police will last several months.
Selection of products
To read also
- “Two reactors per year”: EDF’s very ambitious bet to revive nuclear power
- Nuclear waste: the “battle” of expropriations begins in Bure
- Return to favor of nuclear power in the European Union
- Nuclear: the forecast cost of the six future EPRs will increase by 30%
- Ten small nuclear reactor projects presented to ASN
- Eleven countries, including France, call on the EU to no longer discriminate against nuclear power
- Nuclear safety reform: the IRSN inter-union fears “a drop in the level of protection”
- EDF formally a candidate for the construction of an EPR in the Czech Republic
Popular News
- Is the investment in stone going against the wall?
- The mortgage rate fell in February, for the first time in 1 years
- Building and real estate: a sector plagued by crises but whose ecological transition is underway
- As the world burns more fossil fuels than ever, persistent obstacles hamper the race for renewable energy