Connecting electric vehicle charging infrastructure and new solar and wind farms to the electricity distribution network will require a historically high level of investment of more than 5 billion euros per year by 2032, Enedis announced on Monday. March 13.
Selection of products
To read also
-
New CEO for Akuo, acquired by Ardian
-
Colas wins contract to renovate a road in Alaska
-
Engie to decarbonize 22 Airbus industrial sites in Europe
-
Action Logement obtains 24 billion euros in loans from the Caisse des Dépôts to build and renovate housing
-
Socotec acquires the technical audit activities of 8.2 France and strengthens its position in wind and photovoltaic power
-
Certivea launches the first HQE “One Shot” certification to help stakeholders improve and certify the performance of a building in operation
-
Quarco Ingénierie sets up in Vendée and strengthens its development in Rennes and Anglet
-
Acieo develops an innovative maintenance offer to strengthen the sustainability of buildings
Popular News
-
The modification of the DPE in favor of electric heating should allow 850.000 homes to be freed from the status of energy sieves
-
DPE: the “green value” of a home after renovation can vary from one to three times depending on the city
-
New DPE calculation: professionals denounce a harmful change for energy renovation
-
Collapses on Rue d'Aubagne in Marseille: prison sentences for co-owners, suspended sentences for the elected official and the expert