From November 16, 2026, the A13 will be closed in the Paris-to-provinces direction between Porte d'Auteuil and Vaucresson, until the end of August 2027. A 50% reduction on the A14, restrictions on through traffic, public transport and diversion routes should limit the consequences of the Saint-Cloud tunnel construction.
Selection of products
To read also
-
Bordeaux-Toulouse high-speed rail line: SNCF Réseau authorizes the launch of two design-build contracts
-
A13: Saint-Cloud tunnel closed, A14 toll-free until August 31, 2027
-
Galeries Lafayette in Bron: 5.500 m² of Ytong walls for a transformation while the site is occupied
-
In Choisy-le-Roi, a block of 386 housing units is taking shape on the banks of the Seine.
-
Laying of the foundation stone for the extension and restructuring project of the nursing home in Angers
-
Marseille Fos: Construction begins on the future Le Phare headquarters
-
In Torcy, Etixia is investing over 3 million euros in the renovation of Bay 1
-
Grand Paris Express: lines 16 and 17 postponed to 2028 and 2029
Popular News
-
Mortgage loans: rising interest rates are eroding the amount of living space households can afford
-
Air conditioning in condominiums: demand is increasing, but installation remains complex
-
Combining work and retirement: the new restrictions will apply from January 1, 2027
-
Mortgage loans: rising interest rates are slowing purchases and weakening the new housing market
Publi-editorial
-
Wall dampness: Oxi distinguishes three paints depending on the problems to be treated.
-
Pellet heating: choosing the right fuel and preparing for winter with Bricomarché
-
The Allen key: a small tool, a big role in professional assembly
-
Sonepar, a world leader in the distribution of electrical equipment




