La Fabrique de Bordeaux Métropole (La Fab), in conjunction with Bordeaux Métropole and the town of Gradignan, have appointed the group led by QUARTUS and the Verrecchia group for the construction of blocks C1 and C2 of the ZAC Cœur(s) de Gradignan in alongside architects DATA and Nadau. Work on this development operation is scheduled to start in 2025.
Selection of products
To read also
-
Ris-Orangis in Essonne presents its stadium project in the hope of welcoming PSG
-
Are the Cézanne landscapes on the Sainte-Victoire threatened by a real estate project?
-
In Fos-sur-Mer, decarbonization with several unknowns
-
French Eiffage and Spanish Acciona to build Madrid's new Formula 1 circuit
-
2030 Olympics: To deliver everything on time, "twelve months ahead will be decisive"
-
Two calls for tenders by June to build 3.000 modular prison places
-
The mineral Place de la Concorde should regain its former greenery
-
Reception, competitiveness: ADP wants to "adapt" Roissy without "gigantism" by 2035
Popular News
Publi-editorial
-
Water containment fire extinguishing: TuboPROTECT by ViaCon France
-
The Edilteco® PAE range: lightweight screeds and mortars combining performance and ease of installation
-
Net-Trol®, Backwood and Owastrip®: understanding wood and ensuring the durability of structures
-
AGC's Glass Configurator now also provides verified FDES sheets.