The City of Paris plans to double the number of trees around Notre-Dame as part of a €50 million redevelopment project aimed at greening the site and improving its summer appeal. However, the plan for a visitor center beneath the cathedral square has been abandoned due to technical and archaeological constraints, as well as the risk of flooding.
Selection of products
To read also
-
Line 18: Léon Grosse wins a €29 million contract for Guyancourt station
-
Marcq-en-Barœul: a mixed-use development of 2.362 m² for the future headquarters of La Flandre Assurances
-
In Dinard, a new hospital with 84 beds and approximately 75 housing units are planned on the Arthur Gardiner site.
-
In Montreuil, two new fountains are planned for 2027 to meet the needs of the neighborhoods.
-
Extension of line 1 to Val-de-Fontenay: three options submitted for consultation
-
Bouygues Construction is building a 239-meter residential tower in Pattaya
-
Alps 2030: Bouygues Immobilier selected to build the Aravis Olympic Village
-
Montparnasse Tower: €800 million renovation project rejected by co-owners
Popular News
-
Real estate: prices are falling again, rising interest rates weaken the recovery
-
Mortgage loans: November rates exceed 4% over 25 years for some households
-
2027 Budget: The French Building Federation (FFB) warns of rising labor costs in the construction sector
-
As the 2027 presidential election approaches, the French are placing housing among their priorities and favoring renovation.
Publi-editorial
-
The Allen key: a small tool, a big role in professional assembly
-
Structural work, finishing work, technical activities: what ten-year warranty applies to each trade?
-
Interior parquet and wood flooring: Owatrol presents the Oléofloor matte and satin finishes
-
New LITED 2026 catalog: new lighting solutions for your projects



