Bare earth as far as the eye can see, a ceaseless ballet of trucks several meters high and terraces in the chalk cliff: in Penly, the nuclear revival project carried out at a forced pace by the government is reshaping the landscape of the Alabaster Coast.
Selection of products
To read also
-
Lyon-Turin Base Tunnel: Implenia, NGE and Itinera reach a key milestone in the tunnel with the construction of the first vault of the final lining on the French side
-
In Marseille, the Bonne Mère regains the splendor of its crown marking the end of the work
-
The European Metropolis of Lille lays the foundation stone of the future Wattrelos–Leers wastewater treatment plant
-
See you in 2030: the Pompidou Center closed for five years of renovation
-
In Barcelona, the tallest tower of the Sagrada Familia is expected to be completed in 2026
-
Runway 1 at Roissy-CDG Airport completely renovated for the first time
-
NGE secures Annecy's drinking water supply thanks to an exceptional project
-
Start of construction of the “Les Roseaux” Autism Medical-Educational Institute in Bischwiller (67)
Popular News
-
Government announces emergency plan to address historic housing crisis
-
The CAPEB is demanding concrete and immediate measures to pull the building trades out of the crisis.
-
Slight increase in housing building permits in September
-
Mortgage rates: a market seeking balance despite a still unstable autumn








