Built in Schipkau, Brandenburg, the Gicon experimental wind turbine has reached its final height of 365 meters, with a hub located 300 meters above the ground. It is scheduled to be commissioned in November 2026 to assess the potential of high-altitude winds and the feasibility of increasing the density of existing wind farms.
Selection of products
To read also
-
MaPrimeRénov': alleged multi-million euro fraud in court
-
In China, at least 14 people died in a building fire in Taiyuan
-
Real estate: PNF raids in Cavallo and the Nice region
-
In India, Abha Narain Lambah is restoring heritage in the face of urban pressure
-
In Mannar, Sri Lanka, opposition to wind turbines is hindering new projects.
-
Bhutan: 108 Buddhist monuments to symbolically launch the future city of Gelephu
-
In Los Angeles, housing and infrastructure are at the heart of the mayoral race.
-
On the eve of the midterms, Trump puts his Washington projects in the spotlight
Popular News
-
New housing: permits increased in September, construction starts declined
-
Real estate: prices are falling again, rising interest rates weaken the recovery
-
Mortgage loans: November rates exceed 4% over 25 years for some households
-
2027 Budget: The French Building Federation (FFB) warns of rising labor costs in the construction sector








