After seven years of work, the public open-air swimming pool in Garbsen, near Hanover in Germany, has reopened its doors. Several daybeds as well as 200 m2 of rest areas in Kebony wood have been installed within this vast leisure area.
Selection of products
To read also
-
At the new Trousseau hospital, 16.000 m² of Hybris31 insulation was installed on the perimeter walls.
-
ICF Habitat is rehabilitating 75 homes in Villeneuve-Saint-Georges for 4,4 million euros
-
Eole: a €209 million maintenance site inaugurated in Mantes-la-Jolie
-
In Antony, nearly 1.000 homes are switching to a heating system combining geothermal and aerothermal energy.
-
In Balma, the comprehensive renovation of 373 social housing units combines external insulation using rock wool and a B energy efficiency label.
-
In Paris, Bergère x Paris is renovating 26.500 m² of office space while preserving 632 existing window frames
-
Electricity storage: a 240 MW installation inaugurated in Cernay-lès-Reims
-
A26 is designing three 20-bed units at the Pierre-Lôo Hospital Center
Popular News
-
Mortgage loans: rising interest rates are eroding the amount of living space households can afford
-
Air conditioning in condominiums: demand is increasing, but installation remains complex
-
Combining work and retirement: the new restrictions will apply from January 1, 2027
-
Mortgage loans: rising interest rates are slowing purchases and weakening the new housing market










