Air conditioning, fresh water, schedules, equipment: on a construction site in the Paris suburbs, a labor inspector bombards workers and managers with questions to ensure they are ready to face the new heatwave that already seems to be on the horizon.
Selection of products
To read also
-
Shutters, air conditioning, exposure: heatwaves change the criteria for searching for accommodation
-
Drought: Syntec-Ingénierie calls for the integration of water management from the project design stage
-
The government is launching work to accelerate the climate change adaptation plan
-
Forest fires: France Bois Forêt calls for strengthened prevention and adaptation of forest areas
-
Forest fires: private forest owners demand more resources and a 50-meter no-build zone
-
Forest fires: exceptional measures for victims and businesses
-
Urban cooling networks: a solution that needs to be scaled to withstand extreme heatwaves
-
In Paris, a media library has become a "climate refuge" in the face of heatwaves.
Popular News
-
Business failures: nearly 17.500 cases in the second quarter of 2026, up 5,4%
-
Solar panels: Creuse, Ain and Vosges show the strongest increases in installations in France
-
Montparnasse Tower: Asbestos removal project put to a vote despite conflicts between co-owners
-
Fires in Gironde: UNICEM calls for a case-by-case resumption of activities in the materials sector
Publi-editorial
-
Plastic pallet or wooden pallet: how to choose for your workshop or garage?
-
Obligation and safety: the role of the manufacturer's plate on construction sites
-
Optimize your project management with the SANCOL reinforced drainage range, which has received Technical Approval and QB certification.
-
Home renovation: understanding how the Effy energy bonus works




