The Montpellier Court of Appeal acquitted EDF Renewables and nine of its subsidiaries, who had been convicted in the first instance for the deaths of lesser kestrels at the Aumelas wind farm in the Hérault region. The court based its decision in particular on a change in the Environmental Code, while France Nature Environnement has announced it will appeal to the Court of Cassation.
Selection of products
To read also
-
Faulty boiler: heating engineer given suspended sentence after two deaths in the Vosges
-
Saint-Brieuc wind farm: Ailes Marines cleared after oil leak on the construction site
-
Illegal tourist rentals: €110.000 fine for a 33m² studio in Paris
-
Energy renovation: three executives sentenced to prison for deceptive business practices
-
Gabonese ill-gotten gains: BNP Paribas and several members of the Bongo family could be tried in France
-
Illegal tourist rentals: a property owner and her concierge service fined €440.000 in Paris
-
Renovation work: a contractor sentenced to prison after abandoned construction sites and over €200.000 in damages
-
MaPrimeRénov' scam: fines of up to €400.000
Popular News
-
New housing: permits increased in September, construction starts declined
-
Real estate: prices are falling again, rising interest rates weaken the recovery
-
Mortgage loans: November rates exceed 4% over 25 years for some households
-
2027 Budget: The French Building Federation (FFB) warns of rising labor costs in the construction sector
Publi-editorial
-
Interior parquet and wood flooring: Owatrol presents the Oléofloor matte and satin finishes
-
Structural work, finishing work, technical activities: what ten-year warranty applies to each trade?
-
Artisan de France publishes the pilot edition of its barometer with 500 profiles of artisans spread across 188 cities
-
Which is the best bioclimatic pergola?




