Replacing a gas, oil, or propane boiler with an air-to-water heat pump involves coordinating several steps: home assessment, equipment selection, finding available subsidies, financing, installation, and performance monitoring. With CapConfort, Hellio and its partners aim to consolidate these steps into a single, comprehensive process.
Available since October 1, 2026, the offer is intended for owners of detached houses equipped with fossil fuel heating. The project was selected as part of the government's call for projects dedicated to integrated heat pump solutions and benefits from the support of the French Agency for Ecological Transition (ADEME).
The consortium brings together Hellio, Homyos, Akéa Énergies, Winter, Alpiq and Cofidis, with the support of Atlantic, Hitachi, Murfy, Survoltage and STOP Exclusion Énergétique.
What the CapConfort offer includesAn initial simulation taking into account the dwelling and the household's actual consumption A technical visit to confirm the suitability of the heat pump and the cost of the work A sizing adapted to the characteristics of the building and the existing radiators A financial package incorporating available aid and, under certain conditions, financing of the remaining balance Post-installation monitoring focusing on energy consumption and actual savings observed |
A simulation based on household consumption
The process begins with a simulation carried out on the CapConfort application. This should allow users to assess whether the installation of a heat pump is suitable for the home and to estimate the potential savings.
The household's actual energy consumption is compared to data measured, using smart meters, in homes already equipped with a heat pump and monitored by Winter. The consortium aims to supplement conventional calculations with data from operational installations.
A technical site visit is then organized to verify the building's characteristics, confirm the project's feasibility, and validate the cost of the work. This step is particularly important to limit the risks associated with equipment poorly suited to the dwelling's needs.
A sizing that takes into account existing radiators
Each air-to-water heat pump must be sized based on the characteristics of the dwelling, its heating needs, the household's consumption and existing emitters.
The goal is to determine a temperature regime compatible with the existing radiators while maintaining equipment performance and thermal comfort. If certain radiators are unsuitable for the heat pump, their replacement can be incorporated into the project.
CapConfort also plans an acoustic study. This should help to define the location of the outdoor unit and to select equipment compatible with the immediate environment of the dwelling, in order to reduce disturbances for the occupants and the neighborhood.
A financing arrangement without advance payment announced by the consortium
The proposed arrangement ensures that the household does not have to pay for the installation upfront. Hellio assists them in accessing the subsidies they are eligible for, including MaPrimeRénov' and bonuses from energy savings certificates (CEE).
The remaining balance can then be financed without a down payment. The zero-interest eco-loan should be considered first. Cofidis also offers an integrated solution when this loan does not cover the entire project or cannot be used.
The granting of financing remains subject to the applicant's eligibility and the assessment of their creditworthiness, in accordance with the provisions of the Consumer Code.
The scheme provides for a monthly payment that includes financing for the remaining balance as well as various services associated with the installation, including maintenance, control and monitoring of consumption.
A fixed-price electricity supply offered for three years
Alpiq offers households joining the program a fixed-price electricity supply for three years. However, the homeowner remains free to keep their current supplier.
According to the consortium, the offer is designed to keep monthly expenses related to the new heating system below the previous gas or oil bill. However, this objective depends on the household's initial situation, the size of the installation, any subsidies received, the financing chosen, energy prices, and usage patterns after the work is completed.
Consumption monitored after installation
The process does not end with the commissioning of the heat pump. The observed consumption is compared to the trajectory established during the project study.
Each household must receive an annual summary detailing its energy consumption and savings. This support should help identify any discrepancies, optimize equipment operation, and better inform residents about their usage.
CapConfort also plans to identify priority insulation work that could improve the heat pump's performance. This approach allows the heating system replacement to be integrated into a broader discussion on the energy renovation of the home.
At least 3.500 installations targeted in two years
With the support of ADEME, the consortium plans to deploy at least 3.500 air-to-water heat pumps over a 24-month period. Its expanded objective reaches up to 10.000 installations for owners of detached houses heated by gas, oil, or propane.
Consumption and savings must be measured across all equipment installed as part of the operation.
A reference panel of 40 installations will benefit from enhanced instrumentation. For these homes, the consortium is announcing a guarantee covering the installation's performance level, going beyond simply monitoring consumption.
“With CapConfort, we want to change the approach: it’s not just about installing a heat pump, but about ensuring it’s truly suited to the home, that its financing is sustainable, and that the expected savings can be tracked over time. It’s this comprehensive approach, with no upfront costs and controlled monthly payments, that should make this transition accessible to households.” Tanguy Dupont, Vice President of the Hellio Group in charge of the Housing division.
Expertise brought together within a single program
Hellio manages the offering, while the partners are involved in the various technical, energy, digital, and financial aspects of the project. Winter contributes in particular to consumption analysis, Alpiq to electricity supply, and Cofidis to financing the remaining costs.
The scheme is part of the objective of the ADEME call for projects, which aims to bring about integrated offers in order to facilitate the deployment of air-water heat pumps in individual houses.