The first phase of the Terres de Bastide development has entered its operational phase within the Bastide Niel mixed development zone in Bordeaux. Developed by Legendre Immobilier, Aquipierre, and Aire Nouvelle, the project includes a student residence with 328 units and a public parking garage with 392 spaces, with the first units expected to be delivered in the second quarter of 2028.
Selection of products
To read also
-
In Angoulême, the Duval Group is launching the transformation of a former garage into a coworking space and shops.
-
Nuclear power: green light for preparatory work on the future EPR2 reactors in Gravelines
-
Montpellier University Hospital chooses the Acosi+ heating and cooling ceiling to ensure thermal comfort in its new geriatrics unit
-
Hardelot: The exceptional Odunes residence enters a new phase with the official laying of the foundation stone
-
Notre-Dame de Fourvière Basilica: a 67-meter scaffolding to restore the four towers
-
Protest against the Seine-Nord Europe Canal, a demonstration banned by the prefecture
-
Le Havre tramway: Spie batignolles paysage is carrying out one of the biggest projects in its history
-
NGE is mobilizing its expertise to replace the footbridge crossing the Allier river in Cournon-d'Auvergne
Popular News
-
MaPrimeRénov': several measures removed and fossil fuel systems excluded from September 2026
-
Energy Performance Certificate (EPC): Some electrically heated homes will be better rated without any work being required from January 1, 2027
-
MaPrimeRénov' and CEE: what changes on September 1st with the electrification plan
-
Energy renovation of heritage buildings: a guide to understanding the recommendations of the Architects of the Buildings of France








